# Automate construction pay apps, lien waivers, COIs, and change orders

> Audit AIA G702/G703 subcontractor pay apps against Procore or Autodesk Build commitments, verify COIs, lien waivers, and state licenses, and sync change orders into Viewpoint Spectrum or Sage 300 CRE.

Source: https://stepwork.com/solutions/construction-pay-apps-and-compliance

Stepwork checks subcontractor pay apps against Procore commitments, COIs, and lien waivers, syncs approved change orders to job cost, and holds non-compliant vouchers.

**Use case:** Subcontractor billing, lien waivers, COI holds, and change-order sync
**Best for:** Construction Controller, Project Accountant, Operations Director
**Outcome:** No overbilled pay apps, missing waivers, or out-of-sync job budgets
**Apps:** Procore, Viewpoint Spectrum, Sage 300 CRE, Autodesk Build, DocuSign, Outlook

## Field teams live in Procore, while job cost, COIs, and pay apps run in ERP

- Key AIA G702/G703 pay app lines into Viewpoint or Sage by hand
- Check subcontractor COIs and workers' comp before every draw
- Chase missing conditional and unconditional lien waivers
- Re-enter Procore or Autodesk Build change orders in job cost
- Catch overbilled schedule-of-values lines after check runs
- Verify state contractor licenses across dozens of active subs

## Three construction back-office procedures, card by card

One audits incoming G702/G703 pay apps against commitments, COIs, and lien waivers; one syncs approved change orders into job cost; and one sweeps active subs for lapsed insurance or state licenses.

- **Audit subcontractor pay apps against Procore commitments, COIs, and lien waivers in Viewpoint Spectrum:** Outlook, Procore, Viewpoint Spectrum, DocuSign, Microsoft Teams
- **Sync approved change orders from Procore into Viewpoint Spectrum budgets and commitments:** Procore, Viewpoint Spectrum, Microsoft Teams
- **Check active subcontractors for expiring COIs and state licenses across Viewpoint Spectrum:** Viewpoint Spectrum, License lookup, Outlook, Microsoft Teams

## The construction and document flows behind these procedures

Recorded actions in your job cost ERP and project tool pair with DocuSign waiver flows.

- Send vendor agreement packet for signature (DocuSign)
- Download completed envelopes for filing (DocuSign)
- Enter subcontract AP voucher with retainage (Viewpoint Spectrum)
- Place subcontractor on compliance payment hold (Sage 300 CRE)
- Extract approved commitments and change orders (Procore)
- Verify contractor license and bond standing (License lookup)

## What manual draw week and sub compliance costs a contractor

Example volumes for a general or specialty contractor running 50 active jobs and 180 monthly sub pay apps. Swap in yours.

- Audit an AIA G702/G703 against commitment, COI, and waivers: 45 a week, 14 minutes each
- Key approved pay app lines and retainage into job cost ERP: 45 a week, 8 minutes each
- Re-enter approved field change orders into job cost phases: 20 a week, 12 minutes each
- Check expiring COIs and state contractor licenses: 25 a week, 6 minutes each

_Example volumes, not a customer's numbers. Minutes are the typical time to do each task by hand. Hours a year assume 50 working weeks._

## Works directly in Viewpoint, Sage, Foundation, CMiC, and Procore

Construction ERPs—whether hosted on-prem, on Citrix/RDP, or in the browser—rarely expose clean APIs for subcontract holds, retainage, or phase budgets. Stepwork works through the exact screens your project accountants use.

- **Job cost and construction ERP:** Viewpoint Spectrum, Viewpoint Vista, Sage 300 CRE, Sage 100 Contractor, Foundation Software, CMiC
- **Project management:** Procore, Autodesk Build, Buildertrend, Excel
- **Waivers, licensing, and portals:** DocuSign, License lookup, Subcontractor portal
- **Inbox and field communication:** Outlook, Gmail, Microsoft Teams, Slack

## Every draw checked against commitment, COI, and waiver before a check cuts

Stepwork reads incoming AIA G702/G703 PDFs and Accord 25 COI forms, then executes deterministically inside Viewpoint, Sage, Foundation, or Procore. Overbilled lines and lapsed policies get held every single draw week—not just when AP has spare time—and every voucher links back to a full run record. Credentials stay in your vault.

## Questions

**Q: Can Stepwork read scanned or non-standard subcontractor AIA G702/G703 PDFs?**
Yes. AI reads both digital and scanned G702/G703 schedules of values, extracts current-period work, stored materials, and retainage, and checks the math before touching your job cost ERP.

**Q: Does it work with desktop or hosted Sage 300 CRE and Viewpoint Vista?**
Yes. Stepwork operates through the application's own screens with a login from your vault, so legacy construction accounting systems without modern REST APIs work the same way cloud tools do.

**Q: How does it handle conditional vs unconditional lien waivers?**
Before releasing a new draw, Stepwork checks that the current period's conditional waiver arrived and that last paid draw's unconditional waiver was countersigned in DocuSign or your sub portal.

**Q: What happens if a PM uses a cost code in Procore that isn't open in job cost?**
Instead of failing silently or posting to a suspense code, the rule holds that change order and pings the PM and project accountant in Teams or Slack with the exact missing phase.

---